Stability study requirement vendor change for primary packing material

If primary packing material only vendor is change (same material with same specification),
Is there stability study required for finish product?

Stability is required to assess the new vendor primary packaging material if there is any possibility for impact on the quality, safety and efficacy of the product …

1 Like

This topic was automatically closed 10 days after the last reply. New replies are no longer allowed.