When LOD and K.F Results are not within the acceptance criteria , So what is the action to be taken at that time?
Deviation shall be raised…
Thanks
By raising the deviation, plant will dry the meteral again to meet the specific requirements…
When LOD and K.F Results are not within the acceptance criteria , So what is the action to be taken at that time?
Deviation shall be raised…
Thanks
By raising the deviation, plant will dry the meteral again to meet the specific requirements…