what is the procedure of change any equipment from facility and introduce the new equipment in same place ???
Prepare exclusion form and exclude machine from BMR and add in exclusion list.
For new machine
Prepare qualification documents
include in new machine list and add in BMR
1 Like
- Initiate decommissioning report for old machine.
2.Conduct room/area qualification.
3.Perform installation of new equipment.
4.PQ can be done in production batches if not critical operation of equipment.
5.Prepare equipment handover certificate to production.
Thanks
4 Likes
first raise a CCF
1 Like
This topic was automatically closed 10 days after the last reply. New replies are no longer allowed.