Equipment change in facility


(Vinod Chauhan) #1

what is the procedure of change any equipment from facility and introduce the new equipment in same place ???


(Sajjad Ahmad) #2

Prepare exclusion form and exclude machine from BMR and add in exclusion list.
For new machine
Prepare qualification documents
include in new machine list and add in BMR


(Md.Asif Hussain) #3
  1. Initiate decommissioning report for old machine.
    2.Conduct room/area qualification.
    3.Perform installation of new equipment.
    4.PQ can be done in production batches if not critical operation of equipment.
    5.Prepare equipment handover certificate to production.

Thanks