Change control required for new sop

Is change control required for preparation of new sop

No, change control is not required to prepare new SOP but it is required to change the existing SOP.

2 Likes

No ,CC is required for each and every thing either new or change

1 Like

I think it is wrong. for introduction,addition,deletion and for modification of existing facility document should be addressed through change request.

1 Like

Any modification/addition/deletion in existing system for betterment purpose we need to raise CCN. However any introduction system can also introduced through CCN.