BMR/BPR /ECR Preparation

BMR/BPR/ECR in the document numbering system should have a version and revision history is required necessary.

Regards,
Jeeva

Yes. Master BMR / BPR should have revision number with revision history page to keep track of changes. This is a controlled document. QA should issue “Controlled copy” by taking photocopy of Master BMR/BPR, putting batch number and controlled stamp on it for every batch to be manufactured.