Qualification of a new laboratory

in our new laboratory can we install the equipements such as autoclave…befor the IQ? merci

1 Like

I would perform as much testing as possible before connecting the equipment to the existing facilities (P&ID check, documentation check etc.). Does your autoclave have its own steam supply or will it be connected to a clean steam system that is already in use?

1 Like

thank you very much claudia for your colaboration.
our autoclave has its own steam supply.
if a have good understanding we can beginig with cleaning de lab then doing the tests for" IQ" then instaling our equipments then qualification of this equipments then we do “OQ” without personel and finaly we do the" PQ"

1 Like

Yes that sounds about right. Good luck!