How many batches are required for Machine PQ?

After completion of IQ/OQ for any equipment, is there need three batches for the performing of PQ or one batch is sufficient?

3 batches

Thank You. Can I use three commercial batches for the market or need three placebo batches?

U can use commercial batches and compare the output product quality parameters with previous approved batches
If no abnormalities are identified w.r.to quality, u can dispatch the product and considered as the equipment is qualified


2 Likes

Thank You So Much Bro. If possible pls send me a PQ Protocol for any Equipment.

Any guideline for this PQ quilification batches?

https://in.docworkspace.com/d/sAI3L54TduaAswfbM7smdFA